"behind schedule" 怎么发音
expression
bi-HIND SKEJ-ool
bi-HIND SHED-yool
释义
Doing something later than planned, or not on track to finish by the set time.
IPA 音标
美式英语
bɪˈhaɪnd/ /ˈskɛdʒuɫ/, /ˈskɛdʒʊɫ
英式英语
bɪhˈaɪnd/ /ʃˈɛdjuːl
简化发音
美式
bi-HIND SKEJ-ool
英式
bi-HIND SHED-yool
语境中听
The construction is behind schedule.
We are behind schedule with the project.
The train is behind schedule.
I’m sorry, but I’m running behind schedule today.