"behind schedule" का उच्चारण कैसे करें
expression
bɪˈhaɪnd/ /ˈskɛdʒuɫ/, /ˈskɛdʒʊɫ
bi-HIND SKEJ-ool
bɪhˈaɪnd/ /ʃˈɛdjuːl
bi-HIND SHED-yool
परिभाषा
Doing something later than planned, or not on track to finish by the set time.
IPA ट्रांसक्रिप्शन
अमेरिकी अंग्रेज़ी
bɪˈhaɪnd/ /ˈskɛdʒuɫ/, /ˈskɛdʒʊɫ
ब्रिटिश अंग्रेज़ी
bɪhˈaɪnd/ /ʃˈɛdjuːl
सरल उच्चारण
US
bi-HIND SKEJ-ool
UK
bi-HIND SHED-yool
संदर्भ में सुनें
The construction is behind schedule.
We are behind schedule with the project.
The train is behind schedule.
I’m sorry, but I’m running behind schedule today.